Customization: | Available |
---|---|
CAS No.: | 9003-20-7 |
Formula: | C4h6o2 |
Still deciding? Get samples of US$ 10/kg
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification | |
Product Name | Liquid Polish Paint |
Material | Acrylic resins, pigments, fillers and additives |
Package | Plastics Bucket, 25 kg/Bucket |
Supporting Products | Primer, Medium Coating, Main Paint |
Coverage Rate | 0.8-1 kg/sq.m in theoretical data value |
Drying Time | Surface Dry 4 hours Totally Dry 24 hours |
Application Tools | Roller and Trowel |
Color | Optional Color or Customized Color |
Gloss | Matte |
Liquid Polish Paint
Liquid Polish Paint is the latest ecological art wall material, which is made of high-end imported copolymer emulsion and additives.
Its delicate texture, such as rough industrial style or smooth and meticulous simple Zen style, is a new high-end art paint product integrating functionality and decoration.
Precautions before Construction:
1. The base surface should be solid, flat, neutral and clean.
2. Ensure that the wall to be coated is fully dry, with a pH value of <10 and a moisture content of <8%.
3. Use special instruments to check the flatness of the base surface.
Construction steps:
Before construction, add an appropriate amount of clean water according to construction habits, about 3-10%, and stir evenly before use. The primer enhances the adhesion and uniformity of the paint surface.
Note: Need to wait for the primer to dry before proceeding to the next process, which takes about 4-8 hours.
2. Apply one coat of same color medium coat with a roller.
Before construction, can add an appropriate amount of clean water according to construction habits, about 3-5%, and stir evenly before use. Construction dosage: 3 square meters/kg.
Note: Need to wait for the medium coat to dry completely before proceeding to the next process, which takes about 4-8 hours.
3. Apply two coat of main paint with a trowel.
Before construction, can add an appropriate amount of water according to construction habits, about 3-5%, and stir evenly before use. Construction dosage:1-1.5 square meters/kg.
Note: Need to wait for the first coat of main paint to dry before proceeding to the second coat, about 4-8 hours.
Use a trowel to apply a full batch of main paint for the first time.
After the first coat of main paint is dry, apply the main paint twice to scrape the main paint twice in irregular directions, layer by layer until a layered effect is achieved.
The interval between each coat of paint is about 4-8 hours.
Customer Question & Answer
Q: Are you a trading company or a factory?
Chaoran Building Materials Industry Co., Ltd. is located in Shunde.Guangdong, the "Hometown of Coating" in China.
We are a manufacturerwith nearly 10 years of experience in the production of water-basedcoatings.
What reached a good cooperative relationship with the top 100domestic real estate companies, and its products are exported to manycountries in the Middle East, Africa and Southeast Asia.
Q:Can you provide the samples?
Yes, we can offer you this sample for free, but the shipment charge usuallypaid by your side, please advise your express account and address indetails.Thanks
Q.can l have my logo on the package?
Of course!Customized logo,customized packaging and graphiccustomization are available.
Q:Can you produce the product according to customers' requirements?
Yes, we have an independent R&D department, can provide OEM & ODMservice.
Q:What's your MOQ (min order quantity)?
Our MOQ is 100Kg, and we accept mixed order.
Q:What's your capacity?
We can produce 40 tons per machine, with strong control over the productthat can reduce the color difference in each project.
Q: What's your delivery date?
For small quantity in stock items, the delivery time is about 5-7days after the payment. For container order, the delivery time is 20-40days after depositpayment.Meantime, delivery time is always on time.